CDM
Principal designer and principal contractor support.
Record
The phase plan and the file
The duty
CDM 2015
Where it is used
From pre-construction to handover
What it does
- Pre-construction information, the design risk register, and the phase plan.
- The F10 prepared when the job is notifiable. We do not send it for you.
- Duties written as hold points, each with an owner.
- The health and safety file at handover. The job does not close on a missing pack.
On the record
- The duty holders are named on the job.
- A hold point is how a CDM duty is tracked. It has an owner.
- The file at the end is the one the site used.
The duty
CDM 2015
Client, designer, principal designer, and principal contractor. We support the duty. We do not take it from you.
Also in The work
All- Retained supportA named adviser on the jobs you are running.
- Audits and inspectionsA check against the arrangements you say you have.
- Policies and arrangementsThe written system the site is supposed to run.
- InvestigationsStarted while people still remember what happened.
- Training and competenceWhat they need before they start the task.
- RAMS reviewSite-specific, or it goes back.
- Set up the apps on your jobThe record in use before we leave.