Plant and equipment · UK duty guide
LOLER examinations
Lifting equipment, and the thorough examination in date.
On the file
The lifting equipment, the thorough examination certificate, and the date it runs out.
Duty
LOLER 1998
Where it is used
On the item, before the lift.
What the duty covers
- Cranes, hoists, and lifting accessories.
- The examination certificate, and the date it runs out.
- Out of date means it does not lift.
On the file
- Crane, hoist, or lifting accessory
- The examination certificate
- The date it runs out
- Whether it may lift
How this duty should sit
These notes describe how the duty can sit on a digital record. This page is a guide to a UK duty. It is not a screen in EHSync Safety.
- The certificate is on the item. You are not hunting a PDF.
- A date that has passed is visible before the lift.
The duty
The UK law we work to, by name.
LOLER 1998
Lifting Operations and Lifting Equipment. Thorough examination at the set intervals.
Who uses it
The site checks the certificate is in date. The thorough examination is done by a competent person. The record keeps the certificate.
Sits with
On the plant register. The certificate is on the item, not in a folder.
What good looks like
Out of date means it does not lift. You are not hunting a PDF.