Changes to the plan
The job changes. The plan has to move with it.
This page is a guide to a CDM 2015 duty. It is not a screen in EHSync Projects, and the app does not do this part of the job for you.
Record
The new version
The duty
CDM 2015
Where it is used
When the job changes
What the duty asks for
- A change to the method, the sequence, or the residual risk means the plan or the RAMS is reviewed.
- The change needs an owner, not a note in an email.
- Commercial variations and cost are a separate matter.
Good practice
- Keep the previous version, and point the site at the current one.
- Name the owner of the change before the gang uses it.
- EHSync Projects can move task dates and track the work that follows a change. Cost and commercial variations are not stored there.
The duty
CDM 2015
The phase plan is reviewed when the job changes.
Also in CDM 2015 guides
All- Set the job upThe duty holders are named before the construction phase starts.
- Pre-constructionWhat the job starts from.
- The phase planHow health and safety will be managed on this job, kept current.
- Hold pointsSome steps should not start while the one in front of them is open.
- RAMS and methodsThe method for the task, specific to this site.
- Drawings and documentsThe current set, not the one from last month.
- Inductions and competenceWho is cleared to be on this site, and who is not.
- The site diaryWhat happened on the job that day.
- HandoverThe health and safety file the client gets at the end.