CDM 2015 guide
Inductions and competence
Who is cleared to be on this site, and who is not.
This page is a guide to a CDM 2015 duty. It is not a screen in EHSync Projects, and the app does not do this part of the job for you.
Record
Who is cleared
The duty
CDM 2015
Where it is used
At the gate, before they start
What the duty asks for
- Site rules, emergency, welfare, and the hazards particular to the job, before they start.
- Cards and tickets in date for the work they will do.
- A visitor induction is not the same as a site induction.
Good practice
- Know who is cleared before they are put on the task.
- A gap should show before the work starts, not after.
- EHSync Projects does not run inductions. Induction and training forms sit in EHSync Safety.
The duty
CDM 2015
Information, instruction, and training for the people on the site.
Also in CDM 2015 guides
All- Set the job upThe duty holders are named before the construction phase starts.
- Pre-constructionWhat the job starts from.
- The phase planHow health and safety will be managed on this job, kept current.
- Hold pointsSome steps should not start while the one in front of them is open.
- RAMS and methodsThe method for the task, specific to this site.
- Drawings and documentsThe current set, not the one from last month.
- The site diaryWhat happened on the job that day.
- Changes to the planThe job changes. The plan has to move with it.
- HandoverThe health and safety file the client gets at the end.