Handover
The health and safety file the client gets at the end.
This page is a guide to a CDM 2015 duty. It is not a screen in EHSync Projects, and the app does not do this part of the job for you.
Record
The health and safety file
The duty
CDM 2015
Where it is used
At handover
What the duty asks for
- The health and safety file: drawings, the residual risks, and how to maintain the building.
- The principal designer prepares it, with information from the principal contractor.
- It is handed to the client at the end of the project.
Good practice
- Build the file from the records the job actually used, not from scratch at the end.
- Know early what is still missing.
- EHSync Projects does not compile the file or hold the job open. Its tasks and milestones can track what is still to hand over.
The duty
CDM 2015
The health and safety file handed to the client at the end of the project.
Also in CDM 2015 guides
All- Set the job upThe duty holders are named before the construction phase starts.
- Pre-constructionWhat the job starts from.
- The phase planHow health and safety will be managed on this job, kept current.
- Hold pointsSome steps should not start while the one in front of them is open.
- RAMS and methodsThe method for the task, specific to this site.
- Drawings and documentsThe current set, not the one from last month.
- Inductions and competenceWho is cleared to be on this site, and who is not.
- The site diaryWhat happened on the job that day.
- Changes to the planThe job changes. The plan has to move with it.