CDM 2015 guide
The phase plan
How health and safety will be managed on this job, kept current.
This page is a guide to a CDM 2015 duty. It is not a screen in EHSync Projects, and the app does not do this part of the job for you.
Record
The construction phase plan
The duty
CDM 2015
Where it is used
On the job, and in the morning meeting
What the duty asks for
- The principal contractor has to have a construction phase plan before work starts.
- Site rules, welfare, emergency, traffic, temporary works, and the high-risk activities for this job.
- It is reviewed when the job changes. It is not a generic statement filed at mobilisation.
Good practice
- The plan the site is using should be the current version.
- Contractors should know which version they were given.
- EHSync Projects can hold the plan as a file on the project. It is not a phase plan editor.
The duty
CDM 2015
A construction phase plan before work starts, and kept under review.
Also in CDM 2015 guides
All- Set the job upThe duty holders are named before the construction phase starts.
- Pre-constructionWhat the job starts from.
- Hold pointsSome steps should not start while the one in front of them is open.
- RAMS and methodsThe method for the task, specific to this site.
- Drawings and documentsThe current set, not the one from last month.
- Inductions and competenceWho is cleared to be on this site, and who is not.
- The site diaryWhat happened on the job that day.
- Changes to the planThe job changes. The plan has to move with it.
- HandoverThe health and safety file the client gets at the end.