CDM 2015 guide
The site diary
What happened on the job that day.
This page is a guide to a CDM 2015 duty. It is not a screen in EHSync Projects, and the app does not do this part of the job for you.
Record
The diary
The duty
CDM 2015
Where it is used
Written the same day
What the duty asks for
- Who was on site, what moved, what was held, and the weather if it mattered.
- Written the same day, with photos if they help.
- It supports monitoring the construction phase. It is not a separate book the office has to chase.
Good practice
- Write it the same day, on the job it belongs to.
- Turn what was held into a task with a name.
- In EHSync Projects, comments and files on the project can carry the day's notes.
The duty
CDM 2015
The principal contractor plans, manages, and monitors the construction phase. The record is how that is shown.
Also in CDM 2015 guides
All- Set the job upThe duty holders are named before the construction phase starts.
- Pre-constructionWhat the job starts from.
- The phase planHow health and safety will be managed on this job, kept current.
- Hold pointsSome steps should not start while the one in front of them is open.
- RAMS and methodsThe method for the task, specific to this site.
- Drawings and documentsThe current set, not the one from last month.
- Inductions and competenceWho is cleared to be on this site, and who is not.
- Changes to the planThe job changes. The plan has to move with it.
- HandoverThe health and safety file the client gets at the end.