CDM 2015 guide
Hold points
Some steps should not start while the one in front of them is open.
This page is a guide to a CDM 2015 duty. It is not a screen in EHSync Projects, and the app does not do this part of the job for you.
Record
The hold point
The duty
CDM 2015
Where it is used
Before the next step starts
What the duty asks for
- Design risk accepted, inductions done, permits in date, scaffold handed over, power on, and the checks you add for the job.
- Monitoring the construction phase means knowing which of these are still open.
- An open hold point is often the reason the programme is stuck.
Good practice
- Give each hold point an owner.
- Make an open one visible on the day, not in the Friday report.
- In EHSync Projects, task dependencies and milestones show what has to finish first. The app does not issue permits or hand over scaffolds.
The duty
CDM 2015
The principal contractor plans, manages, and monitors the construction phase. The record is how that is shown.
Also in CDM 2015 guides
All- Set the job upThe duty holders are named before the construction phase starts.
- Pre-constructionWhat the job starts from.
- The phase planHow health and safety will be managed on this job, kept current.
- RAMS and methodsThe method for the task, specific to this site.
- Drawings and documentsThe current set, not the one from last month.
- Inductions and competenceWho is cleared to be on this site, and who is not.
- The site diaryWhat happened on the job that day.
- Changes to the planThe job changes. The plan has to move with it.
- HandoverThe health and safety file the client gets at the end.