CDM 2015 guide

Hold points

Some steps should not start while the one in front of them is open.

This page is a guide to a CDM 2015 duty. It is not a screen in EHSync Projects, and the app does not do this part of the job for you.

  • Record

    The hold point

  • The duty

    CDM 2015

  • Where it is used

    Before the next step starts

What the duty asks for

  • Design risk accepted, inductions done, permits in date, scaffold handed over, power on, and the checks you add for the job.
  • Monitoring the construction phase means knowing which of these are still open.
  • An open hold point is often the reason the programme is stuck.

Good practice

  • Give each hold point an owner.
  • Make an open one visible on the day, not in the Friday report.
  • In EHSync Projects, task dependencies and milestones show what has to finish first. The app does not issue permits or hand over scaffolds.

The duty

  • CDM 2015

    The principal contractor plans, manages, and monitors the construction phase. The record is how that is shown.