CDM 2015 guide
RAMS and methods
The method for the task, specific to this site.
This page is a guide to a CDM 2015 duty. It is not a screen in EHSync Projects, and the app does not do this part of the job for you.
Record
The RAMS
The duty
CDM 2015
Where it is used
With the gang, before the task
What the duty asks for
- Risk assessment and method statement together. Hazards, controls, sequence, and the people.
- The method has to fit this site and this task. A generic pack is not enough.
- A change mid-job means a reviewed method, not a marked-up PDF.
Good practice
- Make it clear which version is the one in use.
- The people doing the work should see the method they were briefed on.
- EHSync Projects does not approve RAMS. The risk assessment and method statement forms sit in EHSync Safety.
The duty
CDM 2015
The people doing the work need a method for this site.
Management of Health and Safety at Work Regulations 1999
The assessment and the controls for the task.
Also in CDM 2015 guides
All- Set the job upThe duty holders are named before the construction phase starts.
- Pre-constructionWhat the job starts from.
- The phase planHow health and safety will be managed on this job, kept current.
- Hold pointsSome steps should not start while the one in front of them is open.
- Drawings and documentsThe current set, not the one from last month.
- Inductions and competenceWho is cleared to be on this site, and who is not.
- The site diaryWhat happened on the job that day.
- Changes to the planThe job changes. The plan has to move with it.
- HandoverThe health and safety file the client gets at the end.