CDM 2015 guide

Pre-construction

What the job starts from.

This page is a guide to a CDM 2015 duty. It is not a screen in EHSync Projects, and the app does not do this part of the job for you.

  • Record

    The pre-construction information

  • The duty

    CDM 2015

  • Where it is used

    Before the site opens

What the duty asks for

  • Hazards already known, site constraints, and what the designers have to hand over.
  • Design risks are recorded, with who accepted each one.
  • A notifiable job needs an F10 notice to the HSE. Sending it stays with the client, or the principal designer on the client's behalf.

Good practice

  • Keep the known hazards with the job before the first induction.
  • Name the person who accepted each design risk.
  • EHSync Projects can hold the files and the tasks for this stage. It does not prepare or send the F10.

The duty

  • CDM 2015

    Pre-construction information is what the construction phase starts from.