Back to EHSync Projects
CDM 2015 guide
Drawings and documents
The current set, not the one from last month.
This page is a guide to a CDM 2015 duty. It is not a screen in EHSync Projects, and the app does not do this part of the job for you.
Record
The current set
The duty
CDM 2015
Where it is used
On the phone, on the job
What the duty asks for
- The people doing the work need the information that is current.
- An old sheet should be marked superseded, not left in circulation.
- A query on a drawing needs an owner and an answer.
Good practice
- The supervisor should not be working from last month's PDF.
- Keep a query with the drawing it refers to, so it is not lost in an inbox.
- EHSync Projects can hold files and comments on a project. It is not a drawing register.
The duty
CDM 2015
The information the people doing the work need, in the version that is current.
Also in CDM 2015 guides
All- Set the job upThe duty holders are named before the construction phase starts.
- Pre-constructionWhat the job starts from.
- The phase planHow health and safety will be managed on this job, kept current.
- Hold pointsSome steps should not start while the one in front of them is open.
- RAMS and methodsThe method for the task, specific to this site.
- Inductions and competenceWho is cleared to be on this site, and who is not.
- The site diaryWhat happened on the job that day.
- Changes to the planThe job changes. The plan has to move with it.
- HandoverThe health and safety file the client gets at the end.